
elcoCAD Main Features • Powerful drafting functionalities • Cabling - high capability circuiting tools • Bill of quantity, schedules and reports • interfaces to lighting design applications DIALux/RELUX© • interface to cable calculation application ProDesign© • clash detection inbuilt with NavisWorks© • work in 2D, visualise in 3D • fully adaptable to your company drawing standards • AutoCAD/AutoCAD LT/ADT add-on |
||||
| Compact R4 |
R4 | Feature | ||
| Project and Drawing Management | ||||
| l | l | Project Navigator | ||
| l | l | Drawing Manager | ||
| l | l | Drawing Management, revision-control, journal for incoming and outgoing drawings | ||
| l | l | Automatic title block update, click & learn for 3rd party title blocks | ||
| l | l | Project Import/Export - Wizzard (EPX) | ||
| CAD Tools | ||||
| l | Convert existing CAD-drawings to elcoCAD models / click & learn module | |||
| l | 3D on demand / visualisation | |||
| l | l | Ceiling grid tool | ||
| l | l | Construction line module | ||
| l | l | Symbol-Manager | ||
| l | l | Toolbar-Manager: user defined symbol palettes | ||
| l | l | Symbol alignment tools 2D/3D: door, wall, symbol | ||
| l | l | Symbol placement tools 2D/3D: single, center, grid, arrangement, lineup, radius | ||
| l | l | Containment 2D/3D | ||
| l | l | Automatic drawing legend | ||
| Design Tools | ||||
| l | Label Generator: rule-based labelling | |||
| l | l | Building Manager: rooms, zones | ||
| l | l | Lighting Analysis: Bidirectional DIALux interface | ||
| l | l | Lighting Analysis: Bidirectional RELUX interface | ||
| l | l | Energy Analysis | ||
| l | l | Cable Manager | ||
| l | l | Automated labelling | ||
| l | l | Automated circuit lines | ||
| l | l | Containment: cable fill, spare capacity | ||
| l | l | Manual circuit lines | ||
| l | l | Power Analysis: Amtech ProDesign link | ||
| l | l | Fire Alarm Systems: detector layout BS 5839 | ||
| l | l | Fire Alarm Systems: detector arrangement review BS 5839 | ||
| Output | ||||
| l | Automatic block diagrams | |||
| l | l | Output Manager | ||
| l | l | Bill of quantities | ||
| l | l | Room schedule | ||
| l | l | Zone schedule | ||
| l | l | Containment schedule | ||
| l | l | Cable schedule | ||
| l | l | Board schedule | ||
| l | l | Energy Analysis report | ||
| l | l | Cost & time estimation* | ||
| l | l | Planned/actual comparison* | ||
| l | l | 4D planning, MS-Project interface* | ||
| *requires elcoCAD iQ module | ||||